Focus on Capabilities

Capabilities > Marine > Manitowoc Water Intake

Get Adobe Flash player Install latest flash player if you can't see this gallery.

space space

Manitowoc Water Intake

 

Location:
Manitowoc, Wisconsin

 

Project Owner:
Manitowoc Public Utilities

 

Bid Amount:
$3,600,000.00
 

 

Manitowoc Water Intake

This $3.6-million raw water intake features the installation of 4,000 feet of 60-inch, pre-stressed concrete cylinder pipe that is housed within a 500-foot-long sheeted trench and 3,500-foot open cut trench.

Durocher Marine connected the open waters of Lake Michigan to the on-shore raw water pump station with two, 17 ½ -foot-long, 5-foot-diameter screens and more than three-quarters of a mile long water intake pipeline.