Working as a subcontractor with the Fort Defiance Construction Co., Kokosing installed twin, 190-foot-long, CIPP-lined 38-inch-by-60-inch elliptical concrete culverts under Interstate 77 near Wapakoneta.
In performing our company’s first elliptical pipe-lining project, Kokosing set up behind the general contractor’s barrier wall to use the cured-in-place pipelining method. The $167,000 project featured Kokosing lining the pipe through culvert endwalls located near the project’s right-of-way.