Sub Aqueous Pipeline Installation
Sub Aqueous Pipeline Installation

Sub Aqueous Pipeline Installation
Sub Aqueous Pipeline Installation

Sub Aqueous Pipeline Installation

The Durocher Marine Division’s capabilities include the installation of intakes, outfalls and river crossings throughout the US and Caribbean. They have completed projects with pipe requirements from 3 to 108 inches in diameter, and from 150 to 15,000 feet long.   When it comes to underwater pipe work, Durocher has the experience to tackle any job, including retro rocking for support and protection twin 24” high pressure natural gas pipelines over 10 miles in total length in water depths exceeding 250 feet. Durocher is undoubtedly one of the most experienced and best qualified marine contractors performing this type of work.

 

Sub Aqueous Pipeline Installation

The Durocher Marine Division’s capabilities include the installation of intakes, outfalls and river crossings throughout the US and Caribbean. They have completed projects with pipe requirements from 3 to 108 inches in diameter, and from 150 to 15,000 feet long.   When it comes to underwater pipe work, Durocher has the experience to tackle any job, including retro rocking for support and protection twin 24” high pressure natural gas pipelines over 10 miles in total length in water depths exceeding 250 feet. Durocher is undoubtedly one of the most experienced and best qualified marine contractors performing this type of work.