I-70 Belmont County

Keeping commuters first.

INSIDE THE PROJECT

Located in Belmont County, Ohio, this five-mile long Design-Build project consisted of design and complete reconstruction of a heavily traveled section of I-70 where maintenance of traffic was a key element.  Scope of work included the placement of 226,000 cubic yards of an unbonded concrete overlay with asphalt bond breaker placed over the existing pavement.  Kokosing placed 42,000 tons of temporary asphalt and temporarily widened two of the four structures for maintenance of traffic purposes.

 