Water Resources Second Barrel Interconnector Augmentation > Projects > Second Barrel Interconnector Augmentation Process and building components of this greenfield facility included: – influent screening facility and aeration tanks – secondary control building with blowers and sludge pumps – flow splitting – final settling tanks – tertiary filtration facilities – UV disinfection and post aeration – liquid sludge thickening and storage – 8,000 feet ~ 60-inch diameter effluent piping – administration, laboratory and storage buildings Sitework included approximately 216,000 cubic yards of earthwork; placement of over 28,000 cubic yards of concrete foundations, walls and slabs; 2,300 tons of reinforcing steel; and 54,000 lineal feet of underground piping. Construction and material handling efforts were supported by use of a tower crane and maintaining a team of more than 150 union craft personnel and area superintendents to deliver the project in only 26 months. Kokosing answered the challenge: to transform an agricultural field into a fully functional, state- of-the art, $65-million, 8 MGD wastewater treatment facility in only 26 months. PROJECT DETAILS: Project Name: Second Barrel Interconnector Augmentation Second barrel 08.03.22 9 Close Second barrel 08.03.22 9
Process and building components of this greenfield facility included: – influent screening facility and aeration tanks – secondary control building with blowers and sludge pumps – flow splitting – final settling tanks – tertiary filtration facilities – UV disinfection and post aeration – liquid sludge thickening and storage – 8,000 feet ~ 60-inch diameter effluent piping – administration, laboratory and storage buildings Sitework included approximately 216,000 cubic yards of earthwork; placement of over 28,000 cubic yards of concrete foundations, walls and slabs; 2,300 tons of reinforcing steel; and 54,000 lineal feet of underground piping. Construction and material handling efforts were supported by use of a tower crane and maintaining a team of more than 150 union craft personnel and area superintendents to deliver the project in only 26 months. Kokosing answered the challenge: to transform an agricultural field into a fully functional, state- of-the art, $65-million, 8 MGD wastewater treatment facility in only 26 months. PROJECT DETAILS: Project Name: Second Barrel Interconnector Augmentation Second barrel 08.03.22 9 Close Second barrel 08.03.22 9