Water Resources Marysville Water Reclamation Facility

INSIDE THE PROJECT

Sitework included approximately 216,000 cubic yards of earthwork; placement of over 28,000 cubic yards of concrete foundations, walls, and slabs; 2,300 tons of reinforcing steel; and 54,000 lineal feet of underground piping. Construction and material handling efforts were supported by the use of a tower crane and a team of more than 150 union craft personnel and area superintendents to deliver the project in only 26 months.

Process and building components of this greenfield facility included:
– influent screening facility and aeration tanks
– secondary control building with blowers and sludge pumps
– flow splitting
– final settling tanks
– tertiary filtration facilities
– UV disinfection and post aeration
– liquid sludge thickening and storage
– 8,000 feet ~ 60-inch diameter effluent piping
– administration, laboratory and storage buildings

WHY IT MATTERS

Kokosing answered the challenge: to transform an agricultural field into a fully functional, state-of-the-art, $65-million, 8 MGD wastewater treatment facility in only 26 months.

PROJECT DETAILS:
  • Project Owner:
    City of Marysville
  • Location:
    Marysville, Ohio
  • Project Value:
    $65,000,000